For an low-priced roof option , consider roll roofing . This material is very easy to install and only requires introductory carpentry skills .

Richard Johnson

For a practical solution when visual aspect is n’t as important , view installing roll roofing . This merchandise is made of fabric exchangeable to composition shingles but loosely is n’t as durable . Be sure to chequer the warranty , which may be for only one yr . If you put in roll roofing using the double - coverage method , it will last longer .

home exterior

Credit:Richard Johnson

gyre roofing is often installed over bare wood sheathing or sheathing that ’s been painted with a primer . Installingrolled roofing feltfirst will better protect the sheathing against condensation and leak .

If theroof is sloped , you’re able to use the queer - nail method . For a slightly slop cap , use the conceal - nail method shown . practice double coverage for a flavorless or nearly flat cap , although a torch - down modified bitumen or EPDM roofis a better solution .

Working with a helper , expect to spend half a day install flashings and undulate roofing for a 700 - square - animal foot cap with modest tortuousness . machinate the roof by tearing off the old shingle or by train for a reroof . Since this is the least difficult roofing material to establish , only basic carpentry skills are needed .

SCR_080_02.jpg

Credit:Better Homes & Gardens

What You’ll Need

Equipment / Tools

Materials

Instructions

How to Install Rolled Roofing

Better Homes & Gardens

Roll Out Materials

Installdrip - bound flash , roofing felt , and WSU , if needed . you could establish metal valley flashing , but it ’s common to hold an 18 - in - wide comic strip of roll roofing instead . adjust it in a bed of roof cementum , smoothen out any creases , and drive nails near the edges .

Attach First Course

Position the first course so it overhangs the drip edges by about ¼ inch and flap it out a distance of 8 ft or so . Drive nails every 3 inch along the blood at one end , pull it taut and motor nails along the eave border . The nails should be about 1 inch from the edges . For spare trade protection , add a 3 - ft - wide funnies on top of the 18 - incher .

Attach Second Sheet

The next shroud overlaps the first by 4 inch or with some type of axial motion roofing , enough to brood the sphere that is unfinished of mineral surfacing . Snap a chalkline indicate the top of the next sheet , roll it out along the line , and drive nail as for the first canvass .

Spread Roofing Cement

Plan so that no two laughingstock joints are closer than2 feet asunder . Spread a 6 - in - wide-eyed layer of roofing cement on the edge of the first sheet and embed the next rag in the cement .

Seal Vents

To seal aplumbing vent , spread roof cement around the pipe . Cut a jam in a piece of roof about 2 feet full and slip it over the tube . The piece should overlap the humbled course by at least 4 inches . Cut a hole in the rolling roofing and slip it over as well . Embed both roofing pieces in cementum . For add protection , add a boot flashing .

Overlap the Valley

Work from one side ceiling past the centre of a vale by 2 feet . Then , working from the other side , overlap the valley , strike a chalk line , and shave the piece at the center of the vale . Keep nails at least 12 column inch from the center of the valley ; use a 4 - inch - blanket layer of roofing cementum to attach everything that is closer than 12 inch .

Attach Final Piece

In most cases , you’re able to just overlap the sheets at the ridge using roofing cement and nails for the last piece . However , if the last piece does not come down at least 8 inches past the peak , cover the peak with a 16 - column inch - wide strip embedded in cement .

Better Homes & Gardens

Optional: Adjust for a Sloped Roof

If you have asloped roof , abridge strips of roofing 9 inch wide , position them flush with the dripping edges along the eave and rake , and attach them by driving two row of nails about 3 inches apart . employ a trowel to disperse roofing cement over half or more of the strips .

Then , set the first form in the cement so it overhang by about ¼ inch . Position and roll out the roofing cautiously because reposition it is n’t loose , then constrict it into the cementum . Nail only its top edge ( the part bare of mineral coating ) . cake the top border with a 4- to 6 - inch - broad layer of roofing cementum and apply the following courses similarly .

SCR_080_03.jpg

Credit:Better Homes & Gardens

SCR_080_06.jpg

Credit:Better Homes & Gardens

SCR_080_07.jpg

Credit:Better Homes & Gardens

SCR_080_08.jpg

Credit:Better Homes & Gardens

SCR_080_09.jpg

Credit:Better Homes & Gardens

SCR_080_10.jpg

Credit:Better Homes & Gardens

SCR_080_04.jpg

Credit:Better Homes & Gardens